Infoworks 6.1.3
Prepare Data

Building a Pipeline Group

After creating the pipeline group, adding pipelines to the group, and setting their execution order, the pipeline group is ready to be built.

Following are the steps to build a pipeline group:

Step 1: Go to Domains and click the respective domain name.

Step 2: Under the Pipeline Groups tab, click the Edit button for the respective pipeline group.

Step 3: Go to Jobs tab and click Build Pipeline Group.

  Last updated